Greetings from Arunexcello Group!

Our website in currently being updated in consonance with the Real Estate (Regulation and Development) Act, 2016 and the Rules made there-under (β€œRERA”), which have been brought into effect from 1st of May, 2017.

Until our website is updated, none of the images, material, stock photography, projections, details, descriptions and other information that are currently available and/or displayed on the website, should be deemed to be or constitute advertisements, offer for sale, marketing, solicitations, invitation to acquire, invitation to offer, including within the purview of the RERA. We humbly request you to directly verify all details and aspects of any proposed booking/acquisition of units/premises, with our authorized representatives. Kindly do not rely on the information contained on this website, until our revision is complete.

Kindly note, that we have decided not to accept any bookings or allotments based on the images, material, stock photography, projections, details, descriptions that are currently available and/or displayed on the website as they are currently being revised to satisfy RERA rules and regulations. We are really excited to make our genuine offerings to be totally complaint with RERA norms which reinforces our unflinching steely resolve to offer nothing but the best to our clients, which no doubt has won the respect and trust from them as well as from our peers in the industry.

If you wish to continue browsing, we consider that you accept the above terms. We deeply appreciate your kind patience and understanding.

April 2nd Week - 20 images
  • 01.Villa B9 – Terrace Brick bat coba work in progress.jpg

    01.Villa B9 – Terrace Brick bat coba work in progress

  • 02.Block  – B.jpg

    02.Block – B

  • 03.Block  – A.jpg

    03.Block – A

  • 04.Block A – 3rd Floor Lintel Level Block Work in progress.jpg

    04.Block A – 3rd Floor Lintel Level Block Work in progress

  • 05.Block A – 3rd Floor Ceiling Plastering Work in progress.jpg

    05.Block A – 3rd Floor Ceiling Plastering Work in progress

  • 06.Block A – 3rd Floor Ceiling Plastering Work in progress.jpg

    06.Block A – 3rd Floor Ceiling Plastering Work in progress

  • 07.Block B – Lift Erection Work in Progress.jpg

    07.Block B – Lift Erection Work in Progress

  • 08.Block B – 4th Floor to Terrace Steps Tandoor Stone Laying work Completed.jpg

    08.Block B – 4th Floor to Terrace Steps Tandoor Stone Laying work Completed

  • 09.Block B – 4th Floor Toilet Wall Tile Laying Work in Progress.jpg

    09.Block B – 4th Floor Toilet Wall Tile Laying Work in Progress

  • 10.Block B – 4th Floor Corridor Floor Tile Laying Work in Progress.jpg

    10.Block B – 4th Floor Corridor Floor Tile Laying Work in Progress

  • 11.Club House – Swimming  Pool area Flooring Concrete Completed.jpg

    11.Club House – Swimming Pool area Flooring Concrete Completed

  • 12.Club House – Ground Floor Room Electrical Conduit Laying work in Progress.jpg

    12.Club House – Ground Floor Room Electrical Conduit Laying work in Progress

  • 13.Club House– Ground Floor Billiards Room Electrical Metal Box Fixing work in Progress.jpg

    13.Club House– Ground Floor Billiards Room Electrical Metal Box Fixing work in Progress

  • 14.Club House – Kitchen Partition Wall Foundation Concrete work in progress.jpg

    14.Club House – Kitchen Partition Wall Foundation Concrete work in progress

  • 15.Club House – Swimming  Pool Extension Non Suspended Slab Concrete Work Completed.jpg

    15.Club House – Swimming Pool Extension Non Suspended Slab Concrete Work Completed

  • 16.Temple Earth Work in Progress.jpg

    16.Temple Earth Work in Progress

  • 17.Temple Footing PCC  Work in Progress.jpg

    17.Temple Footing PCC Work in Progress

  • 18.Hoarding board  Erection Work.jpg

    18.Hoarding board Erection Work

  • 19.Reading Pod Earth Work in Progress.jpg

    19.Reading Pod Earth Work in Progress