Tarangini is located at a walkable distance from Heritage Temple – Veera Ragahavar temple at Tiruvallur

Thiruvallur | 1 & 2 BHK Apts | 19.00 - 25.00 Lakhs (All Incl price)
Download Brochure

Tarangini is located at a walkable distance from Heritage Temple – Veera Ragahavar temple at Tiruvallur and also at a walkable distance from Thiruvallur main bus station. This project is surrounded and thickly populated with More residential development. Day to needs for Grocery items at Thiruvallur market is also located at a walkable distance. Multiplex entertainment is also located very close to the project.

Government as also announced Thiruvallur in the Proposed Extension Plan 3 of Chennai to be developed in the upcoming years. New international airport proposed at Kanchipuram also add feather to the location development of Thiruvallur. Kakalur Sipcot is a developed electronic manufacturing hub offering employment around the location. Suburban Trains ply regularly from Thiruvallur to Chennai Central within 1.10hours of journey which helps public transportation to Chennai city


RERA No.TN/02/0249/2019 www.tnrera.in
Structure
  • RCC framed structure
Wall
  • Lightweight Block Masonry for External & Internal Wall

Flooring

  • Living / Dining / Kitchen / Bed Room – Glossy Vitrified Tile
  • Toilet – Ceramic anti-Skid Tile
Door
  • Treated Wood Door Frames with Flush Shutter for main door and bedroom door
  • Toilet Door – Resin coated Flush Doors
Windows
  • Anodized /Powder coated Aluminium Framed Glazed Windows
  • Anodized /Powder coated Aluminium Framed Glazed Ventilators
Bedrooms
  • Glossy Vitrified tiles for flooring with skirting
  • Loft and Wardrobe provision in bedroom
  • AC point in one bedroom
Kitchen
  • Polished Granite Counter Top and Ceramic Glazed Tile Dado up to 1’8” above the working platform
  • Stainless Steel Sink with single bowl
  • Exhaust Fan provision
  • Loft provision
Sanitary Fittings
  • Floor mounted EWC with flush tank, Washbasin of white colour
  • Wall Mixer for Hot and Cold water in one toilet
Painting
  • Internal Walls: One Coat Primer + 2 Coat Putty + 2 Coat Acrylic Emulsion
  • External walls: One Coat Primer + 2 Coat Exterior Emulsion Paint
  • Toilets
    • Ceramic Glazed Tile Dado up to 5 feet Height
    • White Sanitary Fixtures and CP Fittings
    • Geyser point in Master toilet and wall mixer
    • Only Provision for health faucet
    Electrical work
    • Single phase connection for 1 bedroom flat / Three Phase connection for 2 BHK and with Fully Concealed Wiring
    • Anchor / Equivalent Brand Modular Switches
    • AC point in Master bed room & provision at other bedroom
    • TV point in living room
    • Exhaust fan provision for kitchen
    Power Backup
    • DG backup – for common area lighting and amenities
    • STP with grey water recycling
    • Rainwater harvesting
    • UG sump
    • Solar panel at terrace
    • STP with grey water recycling

    • Rainwater Harvesting

    • Solar Power

    • SALIENT FEATURES

    • Located close to Thiruninravur railway station with good road access and well connected to the city.
    • Proximity to Thirumazhisai and Avadi which are the fastest growing suburbs of Chennai
    • Close to Educational Institutions like Oxford Public School, Sri Ram Vidya Mandir CBSE, Jaya Group of Schools and International Maritime Academy etc.
    • Close to Reputed Companies like India - Japan Lighting Pvt. Ltd, TATA Steels, Easun - MR & Ti Metal Forming etc.
    • Optimum design with minimal common space.
    • Good potable ground water. Clear title. Good specification and sturdy construction.
    • Assured rental returns for investment.
    • Gated community.

    RATE PER SQ. FT (All-inclusive price)

    No of Blocks

    One

    Area

    500sqft -665sqft

    Ground floor
    3850
    First floor
    3900
    Second floor
    3800
    The above rate per sq.ft (Basic + Incidental) is inclusive of applicable GST calculated @ 1% ( CGST : 0.75%, SGST : 0.75%) after 1/3rd abatement for land on total cost

     

    PAYMENT SCHEDULE

    Booking Advance

    25,000/-

    Within 30 days from the date of booking

    30% of the total cost (Booking Advance will be adjusted here)

    On Completion of Foundation

    15% of the total cost

    On Completion of Ground Floor Slab

    15% of the total cost

    On Completion of First Floor Roof Slab

    15% of the total cost

    On Completion of Second Floor Roof Slab

    15% of the total cost

    On Completion of Flooring for respective floor

    5% of the total cost

    On Completion Apartment with standard finish 5% of the total cost
    # Stamp duty & Registration charges for sale deed is based on the Guideline value at the time of Registration. Any increase in the Guideline value of land at the time of registration will add to the difference in stamp duty & registration charges. This difference
    **All Inclusive Charges Includes:- GST Stamp Duty & Registration Charges of Sale Deed and Agreement Charges, legal & documentation charges, E.B connection & deposit charges, Solar Panel Chages, Infrastructure & amenities charges and Maintanence charges for
    *Any Revision in Stamp duty/ Registration fee & taxes will be applicable as per the Government Norms.

    Whilst reasonable care has been taken in preparing the web page and constructing the model (the Materials), the developer shall not be held responsible for any inaccuracies in their contents or between the Materials and the actual unit. All statements, literature and depictions in the Materials are not to be regarded as a statement or representations of the fact. Visual representation such as lay out plans, finishes, illustrations, pictures, photographs and drawings contained in the Materials are artists’ impressions only and not representation of fact. Such materials are for general guidance only and should not be relied upon as accurately describing any specific matter. All information, specifications, plans and visual representations contained in the Materials are subject to changes from time to time by the developer and / or the competent authorities and shall not form part of the offer or contract. The Construction Agreement shall form the entire agreement between the developer and the purchaser and shall in no way be modified by any statements, representations or promises (whether or not contained in the Materials and / or made by the developer) made. No part of the Materials shall constitute a representation or warranty. The floor plans are approximate measurements and subject to final survey.

    Get in Touch