MER ROUGE OIL STORAGE TERMINAL (MOST),MAURITIUS
Project Specification
Client

MER ROUGE OIL STORAGE TERMINAL (MOST),MAURITIUS

Executed By ARUN FABRICATORS
Project

ERECTION & COMMISSIONING OF 25000MT CAPACITY OIL STRORAGE TERMINAL

Concrete poured in CUM

6750

Length of pipeline in Mts

9 KMS

Steel used

1000 Tonnes

Time Frame

16 Months

Project Cost INR 111 Crores

Scope of Work: Construction of dyke area, 3 MOGAS & 2 diesel tanks, hydrocarbon pumping station equipped with 5 pumps, hydrocarbon piping network, firefighting station fitted with water & foam pumps and piping network, Controllers and Instrumentation works for the Entire Terminal.